DEMO09 / PUBLIC SAMPLE

Illustrative product data and imagery; no supplier claims or live product offer.

PROJECT CHECKLIST / 4 MIN READ

Before you send a lighting schedule.
Keep the details together.

A short check for project buyers preparing a fixture list or BOQ.

Keep each fixture line identifiable

A supplier can only compare alternatives when each line stays attached to its location and requirement.

  • Area, room, floor or zone reference
  • Fixture type or current model reference
  • Quantity and unit for that line
  • Mounting method and height, if known
  • Known CCT, CRI, optic or control preference

Mark the open items

If the design team has not selected an optic or control protocol yet, mark it as undecided. A clear unknown is safer than a guessed specification.

Attach the latest revision

Include a revision date or file name for drawings and schedules. Tell the supplier which document is current and whether quantities are preliminary.

Ask a question about this guide